The most iconic location in Gilbert? The water tower of course! Celebrate it with the Gilbert Water Tower Patch.
2.5" x 2.5"
Heat Seal Backing.
Apply with iron, high heat, no steam for 20-30 seconds. Allow patch to cool, check edges, and repeat if necessary. Stitch edges to strengthen.